A4829/25
Checking status...
Crane Operations

A crane is erected near the aerodrome with ICAO markings installed.

2025-12-31 09:30 - 2026-03-31 21:00
Duration:LONG4 months

Period of Applicability

2025-12-31 09:30 - 2026-03-31 21:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A construction crane is erected at 51°10'53"N 004°25'13"E, on bearing 250 degrees and 2,907 m from the ARP, with a height of 224 ft AGL (270 ft AMSL); ICAO obstacle markings are installed.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4829/25 NOTAMR A3205/25
Q) EBBU/QOBCE/IV/M  /AE/000/003/5111N00425E001
A) EBAW B) 2512310930 C) 2603312100
E) CRANE 511053N 0042513E BRG 250DEG, AT 2907M FRM ARP, 224FT AGL /
270FT AMSL. ICAO MARKINGS INSTALLED.