LIB VORTAC is out of service, making DME required unless equipped with suitable RNAV GPS for specified RDU ILS/LOC approaches.
2025-11-19 13:00 - 2025-11-26 15:55
Period of Applicability
2025-11-19 13:00 - 2025-11-26 15:55
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Raleigh–Durham Intl (RDU) instrument approach procedures affected: ILS or LOC RWY 23R (Amdt 12), ILS or LOC RWY 5L (Amdt 6), and ILS RWY 23R CAT II–III (Amdt 12) require DME unless the aircraft is equipped with a suitable RNAV system with GPS due to LIB VORTAC being out of service. Effective from 2025-11-19 1300 to 2025-11-26 1555 EST.
Message
IAP RALEIGH-DURHAM INTL, RALEIGH/DURHAM, NC. ILS OR LOC RWY 23R, AMDT 12... ILS OR LOC RWY 5L, AMDT 6... ILS RWY 23R (CAT II - III) AMDT 12... DME REQUIRED EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, LIB VORTAC OUT OF SERVICE. 2511191300-2511261555EST
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 28 days ago
Was this helpful?