A5215/25
Checking status...
Taxiway Operations

Several taxiways are closed affecting apron taxiway Y, a portion of taxiway N, and a section of taxiway K.

2025-09-15 20:30 - 2025-09-20 03:30

Period of Applicability

2025-09-15 20:30 - 2025-09-20 03:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Apron taxiway Y, taxiway N (between intermediate holding position N2 and apron taxiway Y) and the section of taxiway K between apron taxiways L (excluded) and Y (included) are closed daily from 2030 to 0330. ICAO SGL provided. Reference AIP AD 2 LIML 2-1 and 2-13.

Message

FLW TWY CLSD DUE TO WIP: -APN TWY 'Y' -TWY 'N' BTN INTERMEDIATE HLDG PSN (IHP) 'N2' AND APN TWY 'Y' (BOTH INCLUDED) -TWY 'K' BTN APN TWY 'L' (EXCLUDED) AND APN TWY 'Y' (INCLUDED) RMK: ICAO SGL PROVIDED REF AIP AD 2 LIML 2-1 AND 2-13

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) LIMM/QMXLC/IV/BO /A /000/999/4527N00917E005
A) LIML B) 2509152030 C) 2509200330
D) DAILY 2030-0330
E) FLW TWY CLSD DUE TO WIP:
-APN TWY 'Y'
-TWY 'N' BTN INTERMEDIATE HLDG PSN (IHP) 'N2' AND APN TWY 'Y' (BOTH
INCLUDED)
-TWY 'K' BTN APN TWY 'L' (EXCLUDED) AND APN TWY 'Y' (INCLUDED)
RMK: ICAO SGL PROVIDED
REF AIP AD 2 LIML 2-1 AND 2-13
Issued 4 days ago
Was this helpful?
    Several taxiways are closed affecting apron taxiway Y, a portion of taxiway N, and a section of taxiway K. - LIML NOTAM | Notamify