Taxiway E8 is operational.
2025-11-28 18:00 - 2025-12-31 23:59
Period of Applicability
2025-11-28 18:00 - 2025-12-31 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Taxiway E8 is in operation with a width of 46 m, surface type asphalt, and PCN 66 F/A/X/T.
Message
IN OPR TWY E8 WIDE: 46M TYPE: ASPH PCN: 66 F/A/X/T
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued about 2 months ago
Was this helpful?