G3879/25
Checking status...
Construction Activity

A new obstacle has been added that affects the RWY01 DAKOR PBN initial approach.

2025-10-28 09:44 - 2026-01-21 16:01

Period of Applicability

2025-10-28 09:44 - 2026-01-21 16:01

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

A new obstacle designated MT102 has been added within the area between 15 km and 50 km from the ARP, located on magnetic bearing 160° at 32,786 m with elevation 1,372 m, affecting the RWY01 DAKOR PBN initial approach.

Message

ADD NEW OBSTACLE BETWEEN TWO CIRCLES WITH THE RADIUS OF 15KM AND 50KM (CENTERED ON THE ARP): OBSTACLE ID/DESIGNATION TYPE POSITION MAG BRG(DEGREE)/DIST(M) ELEVATION(M) MARKING/LIGHTING TYPE AND COLOUR FLIGHT PROCEDURE/TAKE-OFF PATH AREA AFFECTED&REMARKS MT102 MT 160/32,786 1,372 - RWY01 DAKOR PBN INITIAL APPROACH

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) ZHWH/QOBCE/IV/M/A/000/999/3019N10929E005
A) ZHES B) 2510280944 C) 2601211601 EST
E) ADD NEW OBSTACLE BETWEEN TWO CIRCLES WITH THE RADIUS OF 15KM 
AND 50KM (CENTERED ON THE ARP):
OBSTACLE ID/DESIGNATION  TYPE  POSITION MAG BRG(DEGREE)/DIST(M)  
ELEVATION(M)     MARKING/LIGHTING TYPE AND COLOUR  FLIGHT 
PROCEDURE/TAKE-OFF PATH AREA AFFECTED&REMARKS  
MT102      MT     160/32,786       1,372     -     RWY01 DAKOR PBN 
INITIAL APPROACH
Issued about 2 months ago
Was this helpful?