G0034/26
Checking status...
NavDeparture Procedures

RWY 28 SID procedures are adjusted due to temporary obstacles, with increased climb gradient requirements on SAM departures.

2026-01-05 01:42 - 2026-04-05 15:59
Duration:LONG4 months

Period of Applicability

2026-01-05 01:42 - 2026-04-05 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Due to temporary obstacles, RWY 28 SID procedures are adjusted: for SAM-1ZD, a 3.7% climb gradient is required before D10.8 MLT; for SAM-2ZD, the required climb gradient before D10.8 MLT is increased from 4.4% to 5.0%; for SAM-8ZD, the required climb gradient before HK624 is increased from 4.4% to 5.0%.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G0034/26 NOTAMR G3596/25
Q) ZJSA/QPDCH/I/NBO/A/000/999/1956N11027E005
A) ZJHK B) 2601050142 C) 2604051559
E) DUE TO TEMPO OBST,RWY28 SID PROCEDURE ADJUSTED AS FLW:
1.REF AIP CHINA ZJHK-7D/7M,SAM-1ZD:BEFORE D10.8 MLT,CLIMB GRADIENT
3.7%.
2.REF AIP CHINA ZJHK-7D/7M,SAM-2ZD:BEFORE D10.8 MLT,CLIMB GRADIENT
CHANGED FM 4.4% TO 5.0%.
3.REF AIP CHINA ZJHK-7H,SAM-8ZD:BEFORE HK624, CLIMB GRADIENT
CHANGED FM 4.4% TO 5.0%.
Was this helpful?