A9766/26
Checking status...
ADRunway Operations

Runway 13/31 is fully covered with frost.

2026-11-05 17:50 - 2026-11-05 23:00
Duration:VERY SHORT5 hours

Period of Applicability

2026-11-05 17:50 - 2026-11-05 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 13/31 is 100% covered with frost from November 5, 2026, at 17:49 until 23:00. The Canadian Runway Friction Index (CRFI) was 0.42 at −16°C, observed at 17:50; the next observation is scheduled for 23:00.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A9766/26 NOTAMR A9714/26
Q) CZEG/QFAXX/IV/NBO/A/000/999/6906N10508W005
A) CYCB B) 2611051750 C) 2611052300
E) RSC 13/31 100 PCT FROST. VALID NOV 05 1749 - NOV 05 2300.
ADDN NON-GRF/TALPA INFO:
CRFI 13/31 -16C .42 OBS AT 2611051750.
RMK: NEXT OBS AT NOV 05 2300.
Was this helpful?