A9887/26
Checking status...
ADRunway Operations

Runway 13/31 is fully covered with frost.

2026-11-05 22:52 - 2026-11-06 15:00
Duration:VERY SHORT16 hours

Period of Applicability

2026-11-05 22:52 - 2026-11-06 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 13/31 is 100% covered with frost from November 5 at 2250 to November 6 at 1500. The Canadian Runway Friction Index (CRFI) was 0.44 at −18°C, observed November 5 at 2251; the next observation is scheduled for November 6 at 1500.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A9887/26 NOTAMR A9766/26
Q) CZEG/QFAXX/IV/NBO/A/000/999/6906N10508W005
A) CYCB B) 2611052252 C) 2611061500
E) RSC 13/31 100 PCT FROST. VALID NOV 05 2250 - NOV 06 1500.
ADDN NON-GRF/TALPA INFO:
CRFI 13/31 -18C .44 OBS AT 2611052251.
RMK: NEXT OBS AT NOV 06 1500.
Was this helpful?