C5809/26
PERM
OpsFlight Procedures

Engine fan blade ice-shedding run-ups must take place on taxiways unless surface conditions make that unsafe.

2026-11-25 14:28 - PERM
Duration:PERMANENT

Period of Applicability

2026-11-25 14:28 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Canada Air Pilot amendment: Engine fan blade ice-shedding run-ups must be conducted on taxiways with strict adherence to the centerline. Flight crews must coordinate with ATC and, on initial contact with clearance delivery at 120.82 MHz, report de-icing requirements, whether a pre-takeoff run-up is required, and its duration if required. If taxiway surface conditions make the run-up unsafe, crews must coordinate with ATC to conduct it at the takeoff position.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C5809/26 NOTAMN
Q) CZEG/QFAXX/IV/NBO/A/000/999/5107N11401W005
A) CYYC B) 2611251428 C) PERM
E) AMEND CANADA AIR PILOT (CAP):
ADD: ENGINE FAN BLADE ICE SHEDDING PROCEDURES:
.
THE COMPLETION OF ACFT ENGINE RUN-UP FOR ENGINE FAN BLADE ICE
SHEDDING MUST BE CONDUCTED ON TWYS. STRICT ADHERENCE TO THE
CENTERLINE IS MANDATORY DURING ENGINE FAN BLADE ICE SHEDDING.
.
PROPER COORDINATION WITH ATC (CLNC DEL OR GND) IS REQUIRED.
.
ON INITIAL CTC WITH CLNC DEL (120.82 MHZ), FLIGHT CREWS SHALL
ADVISE:
- DE-ICING REQUIREMENTS
- RUN-UP REQUIREMENT PRIOR TO TAKE-OFF
- DURATION OF RUN-UP (IF REQUIRED)
.
SHOULD TWY SFC CONDITIONS MAKE ENGINE RUN-UP UNSAFE, FLIGHT
CREWS SHALL COORDINATE WITH ATC TO HAVE THE RUN-UP CONDUCTED AT
THE TAKEOFF POSITION.
Was this helpful?