A9867/26
Checking status...
ADRunway Operations

Runway 10/28, the taxiway and the apron are covered by dry snow.

2026-11-05 21:55 - 2026-11-06 21:55
Duration:SHORT1 day

Period of Applicability

2026-11-05 21:55 - 2026-11-06 21:55

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 10/28 is 100% covered by 1/4 inch of dry snow, reported as packed; the remaining width also has 1/4 inch of dry snow. The taxiway and apron each have 1/4 inch of dry snow across 100% of their surfaces. The report is valid from November 5 at 2154 to November 6 at 2154, with the next observation scheduled for November 6 at 1200.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A9867/26 NOTAMR A9737/26
Q) CZWG/QFAXX/IV/NBO/A/000/999/5353N09212W005
A) CZPB B) 2611052155 C) 2611062155
E) RSC 10/28 100 PCT 1/4IN DRY SNOW. PACKED. REMAINING WIDTH 1/4IN
DRY SNOW. VALID NOV 05 2154 - NOV 06 2154.
ADDN NON-GRF/TALPA INFO:
RMK: TWY 100 1/4 DRY SNOW.
RMK: APN 100 1/4 DRY SNOW.
RMK: NEXT OBS AT NOV 06 1200.
Was this helpful?