A2494/26
EST
Checking status...
ADRunway Operations

Work is in progress beside runway 08 with men and equipment present; follow tower instructions.

2026-08-22 07:28 - 2026-09-21 08:30
Duration:2 months EST

Period of Applicability

2026-08-22 07:28 - 2026-09-21 08:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on the left side of runway 08, 800 m from the runway 08 threshold and 30 m from the runway centerline. Men and equipment are present; follow tower instructions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2494/26 NOTAMR A2232/26
Q)DAAA/QMRHW/IV/BO/A/000/999/2249N00527E005
A)DAAT B)2608220728 C)2609210830 EST
E)WIP ON LEFT SIDE RWY 08. 800M FM THR 08 AND 30M TO RCL
MEN AND EQPT PRESENCE. FLW TWR INSTRUCTIONS
Was this helpful?