A3165/24
Checking status...
Runway Operations

Work in progress parallel to RWY 02/20.

2024-12-14 08:01 - 2025-02-10 09:00

Period of Applicability

2024-12-14 08:01 - 2025-02-10 09:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work in progress parallel to runway 02/20 for a distance of 150 meters from the runway centerline on the right side at the east of runway 02. Caution advised, follow tower instructions.

Message

WIP PARALLEL RWY 02/20 FOR DISTANCE OF 150M FROM RCL RIGHT SIDE AT EAST OF RWY 02 CTN ADVICED FLW TWR INSTRUCTIONS

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3165/24 NOTAMR A2636/24 
Q) DAAA/QFAHW/IV/NBO/A/000/999/2249N00527E005
A) DAAT B) 2412140801 C) 2502100900 EST
E) WIP PARALLEL RWY 02/20 FOR DISTANCE OF 150M FROM RCL RIGHT SIDE AT
EAST OF RWY 02 CTN ADVICED FLW TWR INSTRUCTIONS