A2141/24
PERM
Checking status...
ADTaxiway Operations

Update on TWY F surface and strength specifications.

2024-08-12 11:30 - PERM
Duration:PERMANENT

Period of Applicability

2024-08-12 11:30 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The surface of TWY F is bituminous concrete with a strength of PCN 57/F/A/W/T, replacing the previous specification of NIL.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2141/24 NOTAMN 
Q) DAAA/QMXXX/IV/BO/A/000/999/2249N00527E005
A) DAAT B) 2408121130 C) PERM
E) REF AIP OF ALGERIA
PAGE :DAAT AD 2.8 
PAGE : AD2 DAAT.DA 
TWY SURFACE AND STRENGHT
READ : TWY F 
SURFACE:BITUMINOUS CONCRETE
STRENGHT:PCN 57/F/A/W/T
INSTEAD OF:NIL
Was this helpful?