A2568/26
EST
Checking status...
OBSConstruction Activity

A day- and night-lighted pylon obstacle has been erected.

2026-08-31 07:39 - 2026-12-30 09:30
Duration:LONG5 months EST

Period of Applicability

2026-08-31 07:39 - 2026-12-30 09:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A 60 m pylon obstacle has been erected at 313734.14N 0061002.34E, with an installation elevation of 146.12 m and a top elevation of 206.12 m; it is lighted by day and night.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2568/26 NOTAMR A2033/26
Q)DAAA/QOBCE/IV/M/A/000/999/3140N00608E005
A)DAUH B)2608310739 C)2612300930 EST
E)  PYLON OBST ERECTED:
PSN: 313734.14N 0061002.34E
HGT: 60,00M
ALT INSTALLATION:146,12M
ALT ON TOP:206,12M
DAY AND NGT LGTD
Was this helpful?