V0612/26
Checking status...
NavApproach Procedures

RNP RWY 06 LPV minima are increased, with higher visibility required when the associated ALS is inoperative.

2026-08-12 00:01 - 2026-10-01 22:01
Duration:2 months

Period of Applicability

2026-08-12 00:01 - 2026-10-01 22:01

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

RNP RWY 06 instrument approach procedure changed: LPV decision altitude minima increased to CAT A 894 ft/900 m, CAT B 902 ft/900 m, CAT C 910 ft/1,000 m, and CAT D 919 ft/1,000 m. When the associated approach lighting system is inoperative, increase RVR/visibility to 1,400 m.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0612/26 NOTAMN Q) EBBU/QPICH/I/BO/A/000/999/5027N00427E005 A) EBCI B) 2608120001 C) 2610012201 E) [US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNP RWY 06 RNP RWY 06 INCREASE MINIMA LPV DA* CAT A 894/900M 290 (300-900M); CAT B 902/900M 298 (300-900M); CAT C 910/1000M 306 (400-1000M); CAT D 919/1000M 315 (400-1000M). CHANGE ASSOCIATED ALS INOP NOTE *WHEN ALS INOP, INCREASE RVR/VIS TO 1400M.​
Was this helpful?