A2656/26
EST
Checking status...
ADAirport Operations

The no-break secondary power supply is unavailable.

2026-07-30 08:40 - 2026-08-30 23:59
Duration:2 months EST

Period of Applicability

2026-07-30 08:40 - 2026-08-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The no-break secondary power supply is unavailable; the maximum switch-over time is 15 seconds.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2656/26 NOTAMR A2031/26
Q) EBBU/QFALT/IV/NBO/A /000/999/5112N00252E005
A) EBOS B) 2607300840 C) 2608302359EST
E) NO BREAK SECONDARY SUPPLY NOT AVBL. MAXIMUM SWITCH-OVER TIME 15
SEC.
Was this helpful?