Period of Applicability
2026-11-05 06:00 - 2026-11-06 15:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
SIDs are changed during DKB DVOR/DME maintenance, daily 0600–1500. GPS/FMS RNAV overlays remain unchanged. For runway 25 GEBNO 7B and DKB 9B, replace 15.2 DME DKB with 22.9 DME LBU; BRNAV equipment is required after 22.9 DME LBU. For runway 07 DKB 4H and GEBNO 6H, BRNAV equipment is required after crossing 8.6 DME STG.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?