Period of Applicability
2026-11-12 06:15 - 2027-02-12 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
OCA(H) values are raised for LPV approaches to runways 09L, 09R, 27L and 27R because the missed-approach segment does not provide adequate protection for some navigation systems authorised for LPV operations. Revised values in feet, by aircraft category, are: 09L—A 575 (409), B 585 (419), C 591 (425), D and DL 599 (433); 09R—A 548 (376), B 560 (388), C 568 (396), D 578 (406); 27L—A 533 (355), B 544 (366), C 551 (373), D 560 (382); 27R—A 464 (296), B 476 (308), C 485 (317), D and DL 578 (410).
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?