C4773/26
Checking status...
ADAirport Operations

The aerodrome is available for IFR operations with prior permission required.

2026-11-03 14:17 - 2026-11-08 12:00
Duration:SHORTaggregated 1 day

Period of Applicability

2026-11-03 14:17 - 2026-11-08 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The aerodrome is available for IFR operations with prior permission required on the 4th, 6th and 8th from 0400 to 1200, and on the 7th from 1200 to sunset.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C4773/26 NOTAMR C4694/26
Q) EDGG/QFAAP/I /NBO/A /000/999/4758N00831E005
A) EDTD B) 2611031417 C) 2611081200
D) 04 06 08 0400-1200, 07 1200-SS
E) AD AVBL PPR FOR IFR OPS.
Was this helpful?