I5799/26
PERM
Checking status...
NavApproach Procedures

Cumbernauld IAPs require a written, pre-booked approach time slot that must be adhered to.

2026-08-26 10:11 - PERM
Duration:PERMANENT

Period of Applicability

2026-08-26 10:11 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Instrument approach procedures at Cumbernauld Airport require a written, pre-booked approach time slot obtained from www.cumbernauldairport.org, and the assigned slot must be adhered to; UK AIP EGPG AD 2.22-4/B refers.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

I5799/26 NOTAMN
Q) EGPX/QPIXX/I /BO /A /000/999/5558N00359W005
A) EGPG B) 2608261011 C) PERM
E) FLIGHT PROCEDURES - INSTRUMENT APPROACH PROCEDURES (IAP)
THE IAP MUST HAVE A WRITTEN PRE-BOOKED APPROACH TIME SLOT FROM
CUMBERNAULD AIRPORT WEBSITE WWW.CUMBERNAULDAIRPORT.ORG WHICH MUST
BE ADHERED TO. UK AIP EGPG AD 2.22-4/B REFERS.
Was this helpful?