G1570/26
EST
Checking status...
ADTaxiway Operations

Taxiways E, F and G are not for operational use; vacate runway 08R/26L via taxiway A, and tow aircraft on phase 7, 9 and 10 paved surfaces.

2026-10-31 17:10 - 2027-01-31 23:59
Duration:LONG4 months EST

Period of Applicability

2026-10-31 17:10 - 2027-01-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Referring to AIP 18/24, phases 1–10 are complete, but new taxiways E, F and G are not for operational use. Aircraft must vacate runway 08R/26L via taxiway A only, and aircraft using paved surfaces from phases 7, 9 and 10 must be towed.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

G1570/26 NOTAMR G1226/26
Q) EPWW/QFAXX/IV/NBO/A /000/999/5016N01840E005
A) EPGL B) 2610311710 C) 2701312359EST
E) REF AIP 18/24 - PHASES 1,2,3,4,5,6,7,8,9,10 COMPLETED.
- NEW TAXIWAYS E,F,G NOT FOR OPERATIONAL USE,
- VACATING RWY 08R/26L VIA TWY A ONLY,
- ACFT USING PHASE 7,9,10 PAVED SURFACES BY TOWING ONLY.
Was this helpful?