Period of Applicability
2026-11-21 20:31 - 2026-11-22 04:31
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
SNOWTAM for ESSA: At 20:31 UTC on the 21st, runway 01L had wet snow on all thirds, with runway condition codes 5/5/5, 100% coverage and 3 mm depth throughout; it was chemically treated. At 16:32 UTC on the 21st, runway 08 had condition codes 5/5/5 and 100% coverage throughout; its first two thirds were wet, and its final third had 3 mm of wet snow. Taxiways D, M, PA, U, UF, UG, W, W1–W8, X, X2, X3, X5, Y and Z, and all aprons, were reported poor. Taxiway UB and runway 01R were closed.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?