P7211/26
Checking status...
ADApron Operations

Ramp 3 spots 2 through 4 are frozen, with movement and specified aircraft ground activities prohibited except for participants.

2026-09-01 09:44 - 2026-09-02 15:00
Duration:SHORT2 days

Period of Applicability

2026-09-01 09:44 - 2026-09-02 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A ramp freeze is in effect on 1 and 2 September from 0600 to 1500 UTC at Ramp 3, spots 2 through 4. Engine runs and starts, aircraft taxiing, vehicle movement, and APU/GPU use are prohibited, except for participating vehicles and aircraft.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

P7211/26 NOTAMR P7206/26
Q) EDGG/QMNLT/IV/NBO/A /000/999/4926N00736E005
A) ETAR B) 2609010944 C) 2609021500
E) RAMP FREEZE IN EFFECT ON 1 AND 2 SEPTEMBER FROM 0600-1500Z. NO
ENGINE RUNS, STARTS, AIRCRAFT TAXI, VEHICLE MOVEMENT OR APU/GPU ON
RAMP 3 SPOTS 2 THROUGH 4 EXCEPT FOR PARTICIPATING VEHICLES AND
AIRCRAFT.
Was this helpful?