Sidewalk and stairs are in the runway 09 clear zone.

2026-10-08 16:44 - 2027-01-06 23:59
Duration:LONG4 months

Period of Applicability

2026-10-08 16:44 - 2027-01-06 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

A concrete sidewalk and stairs are in the runway clear zone near the north side of the approach end of runway 09. The stairs have 40-inch-high non-frangible handrails and 41-inch pedestrian lights at the top and bottom.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

P8284/26 NOTAMR P5870/26
Q) EDMM/QMALT/IV/NBO/A /000/999/4913N01150E005
A) ETIH B) 2610081644 C) 2701062359
E) CONCRETE SIDEWALK AND STAIRS IN VCY OF NORTH SIDE OF APPROACH END
RWY09 IN RWY CLEAR ZONE. STAIRS ARE ACCOMPANIED BY 40 INCH HIGH NON
FRANGIBLE HANDRAILS AND 41 INCH PEDESTRIAN LIGHTS AT TOP AND BOTTOM
OF STAIRS.