B0323/26
Checking status...
ADRunway Operations

Runway 09/27 is closed for rehabilitation work; a low pass and ground contact are advised before landing.

2026-10-31 07:00 - 2026-11-30 17:00
Duration:aggregated 10 days

Period of Applicability

2026-10-31 07:00 - 2026-11-30 17:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 09/27 is closed to all traffic for rehabilitation work on Saturdays, Sundays, Mondays, Thursdays and Fridays from 0700 to 1700. Before any landing, a low pass over the runway for visual inspection is strongly advised, along with contacting MINUSCA Bambari Ground on 118.100 MHz.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B0323/26 NOTAMN
Q)FCCC/QMRLC/IV/NBO/A/000/999/0551N02039E003
A)FEFM B)2610310700 C)2611301700
D)SAT SUN MON THU FRI 0700-1700
E)RWY 09/27 CLSD TO ALL TRAFFIC DUE TO REHABILITATION WORK.
IT IS STRONGLY ADVISED TO PERFORM A LOW PASS FLT OVER RWY
FOR VSA INSPECTION AND CTC MINUSCA BAMBARI GND ON 118.100MHZ BFR ANY
LDG.
Was this helpful?