A0001/25
NOTAM Active
Construction Activity

Construction of a new rainwater drainage channel near threshold 06.

2025-01-02 00:01 - 2025-03-31 23:59

Period of Applicability

2025-01-02 00:01 - 2025-03-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work to create a new rainwater drainage channel on the movement area outside the runway strips at 247 meters from the runway centerline at threshold 06. Presence of machines and people in the area. Coordination will be made with the control tower.

Message

WORK TO CREATE A NEW RAIN WATER DRAINAGE CHANNEL IS PLANNED ON THE MOVEMENT AREA NOTABLY OUTSIDE THE RWY STRIPS, 247 METERS FROM THE RWY CENTERLINE AT THRESHOLD 06. PRESENCE OF MACHINES AND PEOPLE. ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0001/25 NOTAMR A0095/24
Q) GLRB/QMAHW/IV/BO /A /000/999/0934N01336W005
A) GUCY B) 2501020001 C) 2503312359 EST
E) WORK TO CREATE A NEW RAIN WATER DRAINAGE CHANNEL IS PLANNED ON THE
 MOVEMENT AREA NOTABLY OUTSIDE THE RWY STRIPS, 247 METERS FROM THE
 RWY CENTERLINE AT THRESHOLD 06. PRESENCE OF MACHINES AND PEOPLE. CTN
 RECOMMENDED. COORDINATION WILL BE MADE WITH CTL TOWER
Issued at: 2025-01-02 14:17
Was this helpful?