M1701/26
Checking status...
NavDeparture Procedures

JEFSEN TWO departure takeoff minimums and climb requirements are revised for Runway 1R due to a temporary crane.

2026-08-26 18:53 - 2026-11-23 23:59
Duration:LONG3 months

Period of Applicability

2026-08-26 18:53 - 2026-11-23 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

JEFSEN TWO departure takeoff minimums for Runway 1R are 300-1, or standard with a minimum climb of 574 feet per nautical mile to 700 feet, due to a temporary crane north-northeast of Runway 19L.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M1701/26 NOTAMN Q) ZDC/QXXXX/IV/NBO/A/000/999/3848N07652W005 A) KADW B) 2608261853 C) 2611232359 E) JEFSEN TWO DEPARTURE: TAKEOFF MINIMUMS RWY 1R, 300-1 OR STANDARD WITH MINIMUM CLIMB OF 574FT/NM TO 700FT. TEMPORARY CRANE 250FT AGL/490FT MSL 2969FT NORTH/NORTHEAST OF RWY 19L.
Was this helpful?