09/021
Checking status...
ADTaxiway Operations

Construction is in progress beside the southeast shoulder of Taxiway H between H1 and H2.

2026-09-18 17:00 - 2026-12-31 23:00
Duration:LONG4 months

Period of Applicability

2026-09-18 17:00 - 2026-12-31 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is in progress adjacent to the southeast shoulder of Taxiway H between Taxiways H1 and H2; the 618-foot work area is lighted and barricaded.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1324/26 NOTAMN Q) KZFW/QMXHW////000/999/3259N09719W005 A) KAFW B) 2609181700 C) 2612312300 E) TWY H BTN TWY H1 AND TWY H2 WIP CONST ADJ SOUTHEAST SHOULDER 618FT LGTD AND BARRICADED