M0021/26
Checking status...
ADAirport Operations

KAHC has limited operating hours, requires landing permission, and reports runway-marking, PAPI, VOR, DME, and NVG-operation information.

2026-11-02 20:57 - 2026-12-01 07:59
Duration:29 days

Period of Applicability

2026-11-02 20:57 - 2026-12-01 07:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

KAHC operates from sunrise to sunset Monday through Thursday, except federally recognized holidays. PAPI lights are installed for approach 26, and prior permission is required for all aircraft landing at KAHC. The VOR is operational but not certified; the DME is offline with no estimated repair time. Runways are marked 08/26 instead of 09/27, and a waiver may be granted for night-vision-goggle operations. Contacts are Gabriela Franco-Padilla (530-827-4126, [email protected]), Michael A. Gray (530-827-5151, [email protected]), and Jodi Brackin (530-827-4703, [email protected]).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M0021/26 NOTAMN Q) ZOA/QFAAH/IV/NBO/A/000/999/4015N12009W005 A) KAHC B) 2611022057 C) 2612010759 E) • KAHC OPERATING HOURS SUNUP - SUNDOWN MON-THURS, EXCEPT FEDERALLY RECOGNIZED HOLIDAYS. • PAPI LIGHTS INSTALLED ON APPROACH 26 • A PPR IS REQUIRED FOR ALL ACFT LANDING @ KAHC • VOR IS OPERATIONAL BUT NOT CERTIFIED • RUNWAYS ARE MARKED AS 08/26 VICE 09/27 • DME IS OFFLINE AND NO ESTIMATED TIME TO REPAIR IS ESTIMATED • A WAIVER CAN BE GRANTED FOR NVG OPS • P.O.C.'S FOR KAHC ARE AS FOLLOWS: GABRIELA FRANCO-PADILLA AT&A OFFICER-530-827-4126 EMAIL: [email protected] , MICHAEL A. GRAY AF. MANAGER - 530-827-5151 EMAIL [email protected] , JODI BRACKIN AST. AF. MANAGER 530-827-4703 EMAIL [email protected]
Was this helpful?