08/047
Checking status...
ADApron Operations

Steel plates are present at the Gate 26 entry point on the Terminal Alpha apron ramp.

2026-08-05 13:17 - 2026-10-31 23:59
Duration:3 months

Period of Applicability

2026-08-05 13:17 - 2026-10-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on the Terminal Alpha apron ramp, with steel plates at the Gate 26 entry point.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4351/26 NOTAMN Q) KZBW/QMNHW////000/999/4156N07241W005 A) KBDL B) 2608051317 C) 2610312359 E) APRON TERMINAL ALPHA RAMP WIP STEEL PLATES AT ENTRY POINT GATE 26
Was this helpful?