6/2026
EST
Checking status...
NavDeparture Procedures

College Park runway 33 takeoff minimums and climb requirements are amended due to temporary cranes.

2026-10-24 04:39 - 2028-05-05 04:39
Duration:VERY LONG19 months EST

Period of Applicability

2026-10-24 04:39 - 2028-05-05 04:39

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At College Park, takeoff minimums for runway 33 are 500-3 with a minimum climb of 211 feet per nautical mile to 700 feet, or 1100-3 for a visual climb over airport (VCOA), due to temporary cranes near the departure path. All other takeoff minimums and obstacle departure procedure data remain as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Message

COLLEGE PARK, COLLEGE PARK, MD. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 5... TAKEOFF MINIMUMS: RWY 33, 500-3 WITH MINIMUM CLIMB OF 211 FT PER NM TO 700, OR 1100-3 FOR VCOA. TEMPORARY CRANES BEGINNING 3654FT FROM DER, BEGINNING 995FT LEFT OF CENTERLINE, 310FT AGL/387FT MSL (2026-AEA-8087 THRU 8090-OE). TEMPORARY CRANE 3194FT FROM DER, 343FT RIGHT OF CENTERLINE, 214FT AGL/278FT MSL (2024-AEA-8722-OE). ALL OTHER DATA REMAINS AS PUBLISHED.

Was this helpful?