5/4748
EST
Checking status...
NavApproach Procedures

Minima and visibility requirements for the RNAV (GPS) RWY 35 approach at KCLL are adjusted, with a noted permanent tower near the approach path.

2025-10-02 10:51 - 2027-05-08 10:51
Duration:VERY LONG20 months EST

Period of Applicability

2025-10-02 10:51 - 2027-05-08 10:51

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

For RNAV (GPS) RWY 35 at Easterwood Field (KCLL), LNAV/VNAV DA is 619 ft/HAT 308 ft for all categories; with inoperative ALS, increase LPV CAT E visibility to 3/4 SM, LNAV/VNAV all categories to 7/8 SM, and LNAV CAT E to 1 3/8 SM; a permanent obstacle tower at 458 ft MSL is located 4,419 ft east of the approach end of RWY 35 (48-183701); effective from 2025-10-02 10:51 until 2027-05-08 10:51 (EST end time).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZHU/QPIXX/I/NBO/A/000/999/3035N09621W005
A) KCLL
B) 2509301623
C) 2605121622EST
E) CLL EASTERWOOD FLD, COLLEGE STATION, TX.
RNAV (GPS) RWY 35, AMDT 1D...
LNAV/VNAV DA 619/HAT 308 ALL CATS.
FOR INOPERATIVE ALS, INCREASE LPV CAT E VISIBILITY TO 3/4 SM, INCREASE LNAV/VNAV ALL CATS VISIBILITY TO 7/8 SM, INCREASE LNAV CAT E VISIBILITY TO 1 3/8 SM.
TOWER, 458 MSL, 4419 FT EAST OF APCH END RWY 35 (48-183701 PERM OBSTACLE)..
Was this helpful?