6/8747
EST
Checking status...
NavDeparture Procedures

Takeoff minimums and obstacle departure procedures are amended to add an obstacle note for RWY 25L.

2026-06-17 17:00 - 2026-11-30 19:50
Duration:LONG6 months EST

Period of Applicability

2026-06-17 17:00 - 2026-11-30 19:50

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Phoenix Deer Valley, Phoenix, AZ. Takeoff minimums and obstacle departure procedures amendment 2 adds takeoff obstacle notes for runway 25L: temporary crane 2591 ft from DER, 137 ft left of centerline, 137 AGL/1559 MSL (2026-AWP-888-OE). All other data remains as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0397/26 NOTAMN Q) KZAB/QPOCH/I/NBO/A/000/999/3341N11204W005 A) KDVT B) 2606171700 C) 2611301950 E) ODP PHOENIX DEER VALLEY, PHOENIX, AZ. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2... ADD TAKEOFF OBSTACLE NOTES: RWY 25L, TEMP CRANE 2591FT FROM DER, 137FT LEFT OF CENTERLIE, 137 AGL/1559 MSL (2026-AWP-888-OE). ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?