5/6419
EST
Checking status...
NavDeparture Procedures

Northeast Kingdom Intl ODP has been amended to add obstacle notes for RWY 5 and RWY 36 due to temporary construction equipment.

2025-04-15 13:25 - 2026-12-11 13:24
Duration:VERY LONG21 months EST

Period of Applicability

2025-04-15 13:25 - 2026-12-11 13:24

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

From 2025-04-15 1325 until 2026-12-11 1324 EST, the takeoff minimums and obstacle departure procedures (ODP) for Northeast Kingdom Intl (Newport, VT) are amended to add obstacle notes: for RWY 5, temporary construction equipment 600 ft from DER, 980 ft left of centerline, up to 126 ft AGL/1004 ft MSL; for RWY 36, temporary construction equipment 780 ft from DER, 680 ft right of centerline, up to 42 ft AGL/1034 ft MSL. All other data remains as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZBW/QPDCH/I/NBO/A/000/999/4453N07213W005
A) KEFK
B) 2504151325
C) 2612111324EST
E) EFK NORTHEAST KINGDOM INTL, NEWPORT, VT.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 4...
ADD TAKEOFF OBSTACLE NOTE: RWY 5, TEMPORARY CONST EQUIP 600FT FROM DER, 980FT LEFT OF CENTERLINE, UP TO 126FT AGL/ 1004FT MSL (2023-ANE-3763 THRU 3767-OE).
ADD TAKEOFF OBSTACLE NOTE: RWY 36, TEMPORARY CONST EQUIP 780FT FROM DER, 680FT RIGHT OF CENTERLINE, UP TO 42FT AGL/ 1034FT MSL (2023-ANE-3744 THRU 3758-OE).
ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?