M1019/26
Checking status...
ADTaxiway Operations

Taxiway J south, taxiways K, L, M, and T, and hot-refuel lanes 1 through 4 do not meet minimum UFC width requirements.

2026-09-18 00:41 - 2026-12-15 23:59
Duration:3 months

Period of Applicability

2026-09-18 00:41 - 2026-12-15 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiway J south and taxiways K, L, M, and T, as well as hot-refuel lanes 1 through 4, are 40 feet wide and do not meet minimum UFC requirements; use caution.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M1019/26 NOTAMN Q) ZDC/QMXXX/IV/NBO/A/000/999/3507N07856W005 A) KFBG B) 2609180041 C) 2612152359 E) TWY J SOUTH AND TWYS K, L, M, AND T AND HOT REFUEL LANES 1 THROUGH 4 ARE 40FT WIDE.DO NOT MEET MINIMUM UFC REQUIREMENTS. USE CAUTION
Was this helpful?