Period of Applicability
2026-09-29 11:01 - 2027-12-31 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
IFR takeoff minimums and obstacle departure procedures are changed: Runway 5L is standard with a minimum climb of 278 ft/NM to 1,100 ft, or 300-1 1/2; Runway 5R is standard with a minimum climb of 266 ft/NM to 1,100 ft, or 300-1 3/4; Runway 23L is 400-2 3/4, or standard with a minimum climb of 210 ft/NM to 1,300 ft; and Runway 23R is 400-2 3/4, or standard with a minimum climb of 260 ft/NM to 1,300 ft.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?