Fort Lauderdale Executive Airport takeoff minimums and obstacle departure procedures Amendment 5 has revised takeoff minimums for runways 9 and 27 and added temporary crane and rig obstacle notes for runways 9, 27, and 31. Runway 9 requires 300-1 or standard minimums with a climb of 444 ft per NM to 300 ft; runway 27 requires 300-1 or standard minimums with a climb of 307 ft per NM to 300 ft. All other data remains as published.