6/6910
EST
Checking status...
NavDeparture Procedures

Farmington Seven and Scapo Seven departures require suitable RNAV with GPS due to the UBG VOR outage.

2026-10-02 17:54 - 2027-05-14 17:54
Duration:VERY LONG8 months EST

Period of Applicability

2026-10-02 17:54 - 2027-05-14 17:54

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The Farmington Seven and Scapo Seven departure procedures are unavailable except to aircraft equipped with a suitable RNAV system using GPS because UBG VOR is out of service.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Message

PORTLAND-HILLSBORO, PORTLAND, OR. FARMINGTON SEVEN DEPARTURE... SCAPO SEVEN DEPARTURE... DEPARTURE PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, UBG VOR OUT OF SERVICE.

Was this helpful?