11/002
Checking status...
ADTaxiway Operations

Taxiway A has a surface depression between taxiways A2 and A3.

2026-11-02 19:45 - 2026-11-06 23:00
Duration:SHORT5 days

Period of Applicability

2026-11-02 19:45 - 2026-11-06 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiway A has an irregular surface with a 1/2-inch depression between taxiways A2 and A3.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0426/26 NOTAMN Q) KZJX/QMXXX////000/999/2817N08126W005 A) KISM B) 2611021945 C) 2611062300 E) TWY A BTN TWY A2 AND TWY A3 IRREGULAR SFC 1/2IN DEPRESSION
Was this helpful?