6/0750
EST
Checking status...
NavDeparture Procedures

Teton Three Departure takeoff minimums and obstacle notes for runway 19 are changed.

2026-06-25 15:41 - 2028-06-26 15:41
Duration:VERY LONG25 months EST

Period of Applicability

2026-06-25 15:41 - 2028-06-26 15:41

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Jackson Hole, Jackson, WY, Teton Three Departure departure procedure takeoff minimums for runway 19 are standard with a minimum climb of 335 ft/NM to 14000, or 4500-5 for VCOA. Takeoff obstacle notes for runway 19 list vegetation, vehicles on road, and trees near the departure path. All other data remains as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3382/26 NOTAMN Q) KZLC/QPOCH/I/NBO/A/000/999/4336N11044W005 A) KJAC B) 2606251541 C) 2806261541 E) ODP JACKSON HOLE, JACKSON, WY. TETON THREE DEPARTURE ... DEPARTURE PROCEDURE. TAKEOFF MINIMUMS: RWY 19: STANDARD WITH MINIMUM CLIMB OF 335 FT/NM TO 14000, OR 4500-5 FOR VCOA. TAKEOFF OBSTACLE NOTES: RWY 19: VEGETATION 43 FT FROM DER, 406 FT RIGHT OF CENTERLINE, 4 FT AGL/6415 FT MSL. VEHICLE ON ROAD 367 FT FROM DER, 576 FT RIGHT OF CENTERLINE, 6423 FT MSL. VEHICLE ON ROAD 470 FT FROM DER, 537 FT RIGHT OF CENTERLINE, 6425 FT MSL. TREE 732 FT FROM DER, 512 FT RIGHT OF CENTERLINE, 6438 FT MSL. TREES BEGINNING 799 FT FROM DER, 609 FT RIGHT OF CENTERLINE, UP TO 6443 FT MSL. TREE 1077 FT FROM DER, 594 FT RIGHT OF CENTERLINE, 6444 FT MSL. ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?