M0322/26
Checking status...
ADRunway Operations

Runway 01/19 is unusable.

2026-11-04 15:30 - 2026-11-09 16:00
Duration:SHORT6 days

Period of Applicability

2026-11-04 15:30 - 2026-11-09 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 01/19 is unusable from 4 November 2026 at 0930 local (1530 UTC) until 9 November 2026 at 1000 local (1600 UTC).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M0322/26 NOTAMN Q) ZJX/QMRLC/IV/NBO/A/000/999/3021N08719W005 A) KNPA B) 2611041530 C) 2611091600 E) RUNWAY 01/19 UNUSABLE FROM 04NOV26 0930 L (1530 Z) TO 09NOV26 1000 L (1600 Z).
Was this helpful?