07/104
Checking status...
ADTaxiway Operations

Lighted and barricaded work is adjacent to the east side of Taxiway A between A4 and A6.

2026-07-28 21:20 - 2026-08-28 22:00
Duration:2 months

Period of Applicability

2026-07-28 21:20 - 2026-08-28 22:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress adjacent to the east side of Taxiway A between Taxiways A4 and A6; the work area is lighted and barricaded.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1173/26 NOTAMN Q) KZFW/QMXHW////000/999/3523N09736W005 A) KOKC B) 2607282120 C) 2608282200 E) TWY A BTN TWY A4 AND TWY A6 WIP ADJ EAST SIDE LGTD AND BARRICADED