6/2075
EST
Checking status...
NavDeparture Procedures

PDX Portland Two Departure RWY 21 takeoff minima and obstacle note updated.

2026-04-16 21:30 - 2026-11-24 12:32
Duration:VERY LONG8 months EST

Period of Applicability

2026-04-16 21:30 - 2026-11-24 12:32

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Portland Two Departure at Portland Intl (PDX): RWY 21 takeoff minimums updated to 300-1 with a minimum climb of 290 feet per NM to 1800, or standard with a minimum climb of 433 feet per NM to 4000; add takeoff obstacle note for a temporary crane 3720 ft from DER, 550 ft left of centerline, 130 ft AGL/204 ft MSL (2026-ANM-1308-OE). Valid 2604162130-2611241232 EST. All other data remains as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZSE/QPDCH/I/NBO/A/000/999/4535N12235W005
A) KPDX
B) 2604141036
C) 2611241035EST
E) PDX PORTLAND INTL, PORTLAND, OR.
PORTLAND TWO DEPARTURE...
TAKEOFF MINIMUMS, RWY 21: 300-1 WITH A MINIMUM CLIMB OF 290 FEET PER NM TO 1800, OR STD WITH A MINIMUM CLIMB OF 433 FEET PER NM TO 4000. RWY 21, TEMPORARY CRANE 3720FT FROM DER, 550FT LEFT OF CENTERLINE, 130FT AGL/ 204FT MSL (2026-ANM-1308-OE).
ADD TAKEOFF OBSTACLE NOTE: RWY 21, TEMPORARY CRANE 3720FT FROM DER, 550FT LEFT OF CENTERLINE, 130FT AGL/ 204FT MSL (2026-ANM-1308-OE).
ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?