4/9589
Checking status...
Airport maintenance

Amendments to ILS or LOC procedures for runways 28L and 28R at Pittsburgh International.

2024-08-15 13:18 - 2025-03-27 13:18

Period of Applicability

2024-08-15 13:18 - 2025-03-27 13:18

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There are amendments to the ILS or LOC approaches for runways 28L and 28R at Pittsburgh International Airport, with a requirement for radar for procedure entry except for specific aircraft equipped for such procedures.

Message

IAP PITTSBURGH INTL, PITTSBURGH, PA. ILS OR LOC RWY 28L, AMDT 11... ILS OR LOC RWY 28R, AMDT 10A... ILS RWY 28R (SA CAT I-II), AMDT 10A.... RADAR REQUIRED FOR PROCEDURE ENTRY EXCEPT FOR ACFT EQUIPPED ...

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZOB/QPIXX/I/NBO/A/000/999/4029N08013W005
A) KPIT
B) 2403280552
C) 2411070552EST
E) PIT PITTSBURGH INTL, PITTSBURGH, PA.
ILS OR LOC RWY 28L, AMDT 11...
ILS OR LOC RWY 28R, AMDT 10A...
ILS RWY 28R (SA CAT I-II), AMDT 10A....
RADAR REQUIRED FOR PROCEDURE ENTRY EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS,
AGC VOR U/S.