10/114
ADApron Operations

Work and steel plates adjacent to gates B4 and B6 on the main terminal ramp.

2026-10-13 08:04 - 2026-12-31 23:59
Duration:3 months

Period of Applicability

2026-10-13 08:04 - 2026-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on the south side of the main terminal ramp, with steel plates adjacent to gates B4 and B6.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A7964/26 NOTAMN Q) KZOB/QMNHW////000/999/4029N08013W005 A) KPIT B) 2610130804 C) 2612312359 E) APRON MAIN TERMINAL RAMP SOUTH WIP STEEL PLATES ADJ GATES B4 AND B6