5/3214
EST
Checking status...
NavDeparture Procedures

LINDBERGH NINE DEPARTURE LIT transition is NA except for suitable RNAV (GPS), and LIT R-018 is unreliable at WEZRR.

2025-12-02 15:54 - 2027-11-27 15:54
Duration:VERY LONG25 months EST

Period of Applicability

2025-12-02 15:54 - 2027-11-27 15:54

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Spirit of St Louis (SUS) LINDBERGH NINE DEPARTURE, LITTLE ROCK transition is not authorized except for aircraft equipped with suitable RNAV (GPS), and the LIT R-018 is unreliable at WEZRR, effective from 2025-12-02 15:54 to 2027-11-27 15:54 EST.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZKC/QXXXX/I/NBO/A/000/999/3839N09039W025
A) KSUS
B) 2512021553
C) 2607141553EST
E) SID SPIRIT OF ST LOUIS, ST LOUIS, MO.
LINDBERGH NINE DEPARTURE ...
LITTLE ROCK TRANSITION NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS. LIT R-018 UNRELIABLE AT WEZRR.
Was this helpful?