6/7724
EST
Checking status...
NavDeparture Procedures

Tuscaloosa NTL takeoff minimums and obstacle departure procedures are changed.

2026-05-04 16:40 - 2028-05-04 16:40
Duration:VERY LONG25 months EST

Period of Applicability

2026-05-04 16:40 - 2028-05-04 16:40

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Tuscaloosa NTL takeoff minimums and obstacle departure procedures amendment 3 changes takeoff minimums for runway 4 to 300-1 7/8 or standard with minimum climb of 258 ft/NM to 800, and for runway 30 to 400-2 1/2 or standard with minimum climb of 389 ft/NM to 700. All other data remains as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0086/26 NOTAMN Q) KZTL/QPOCH////000/999/3313N08736W005 A) KTCL B) 2605041640 C) 2805041640 E) ODP TUSCALOOSA NTL, TUSCALOOSA, AL. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 3... TAKEOFF MINIMUMS: RWY 4: 300-1 7/8 OR STANDARD WITH MINIMUM CLIMB OF 258 FT/NM TO 800. TAKEOFF MINIMUMS: RWY 30: 400-2 1/2 OR STANDARD WITH MINIMUM CLIMB OF 389 FT/NM TO 700. ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?