5/0734
EST
Checking status...
NavDeparture Procedures

Gila Bend transition on the Tucson Nine SID is not authorized unless TACAN or RNAV GPS, and TUS VOR radial 280 is unusable.

2025-01-06 18:50 - 2027-01-06 18:50
Duration:VERY LONG25 months EST

Period of Applicability

2025-01-06 18:50 - 2027-01-06 18:50

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At Tucson International (Tucson Nine SID), the Gila Bend transition is not authorized except for aircraft equipped with TACAN or suitable RNAV with GPS, and the TUS VOR radial 280 is unusable, effective 06 Jan 2025 1850 until 06 Jan 2027 1850 EST (estimated).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZAB/QPDCH/I/NBO/A/000/999/3207N11056W005
A) KTUS
B) 2501061850
C) 2508181843EST
E) TUS TUCSON INTL, TUCSON, AZ.
TUCSON NINE DEPARTURE...
GILA BEND TRANSITION NA EXCEPT FOR AIRCRAFT EQUIPPED WITH TACAN OR WITH SUITABLE RNAV SYSTEMS WITH GPS. TUS VOR R-280 UNUSABLE.
Was this helpful?