5/9376
EST
Checking status...
NavDeparture Procedures

Richard B Helgeson RWY 24 takeoff minimums and ODP changed with required climb gradient.

2025-08-18 14:49 - 2027-08-18 14:49
Duration:VERY LONG25 months EST

Period of Applicability

2025-08-18 14:49 - 2027-08-18 14:49

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At Richard B Helgeson (Two Harbors, MN), ODP/takeoff minimums: RWY 24 is 200-3 or standard with a minimum climb of 210 ft per NM to 2100; all other data remains as published. Effective 2508181449-2708181449EST.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZMP/QPDCH/I/NBO/A/000/999/4702N09144W005
A) KTWM
B) 2508181448
C) 2603301448EST
E) TWM RICHARD B HELGESON, TWO HARBORS, MN.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES ORIG...
TKOF MNM: RWY 24, 200-3 OR STD W/MIN CLIMB OF 210 FT PER NM TO 2100.
ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?