6/0871
EST
Checking status...
NavDeparture Procedures

ODP amendment for RWY 23 at Zephyrhills with updated takeoff minimums and a noted temporary building obstacle.

2026-04-10 15:15 - 2026-11-20 15:15
Duration:VERY LONG8 months EST

Period of Applicability

2026-04-10 15:15 - 2026-11-20 15:15

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Zephyrhills Muni: Takeoff minimums and Obstacle Departure Procedures Amendment 3. RWY 23 takeoff minimums are 300-1 or standard with a minimum climb of 284 feet per NM to 300. Temporary building 247 MSL located 4629 ft SW of RWY 5 (2025-ASO-12461-OE). All other data remains as published. Valid 2604101515-2611201515EST.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZJX/undefined/NBO/A/000/999/2813N08209W005
A) KZPH
B) 2604101515
C) 2611201515EST
E) ZPH ZEPHYRHILLS MUNI, ZEPHYRHILLS, FL.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 3...
TAKEOFF MINIMUMS: RWY 23, 300-1 OR STANDARD WITH MINIMUM CLIMB OF 284 FEET PER NM TO 300.  TEMPORARY BUILDING 247 MSL 4629FT SW OF RWY 5 (2025-ASO-12461-OE).  ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?